Furnishing a flat with custom furniture sounds like a project of months. We will show you, on a model example of a 3-room flat in Prague 6, how such an order runs and why we manage it in six weeks. The number of weeks is a real limit that we write into the contract.
The brief
A family with two children bought a new 3-room flat of 78 square metres. They wanted to move furniture in all at once, without waiting for individual suppliers. The requirements were clear:
- a kitchen with an island and plenty of storage space,
- a built-in wardrobe in the hallway,
- a wardrobe and a bed with storage in the bedroom,
- a children's room with a bunk bed and a desk,
- a living room unit with a TV and a bookcase,
- bathroom furniture.
The budget was set, and the move-in date too: in six weeks.
Week 1: measuring and consultation
In the first week we came to measure the whole flat. With a laser we measured the walls, heights and the position of utility lines. We found that the wall in the living room is slanted by 12 millimetres, and we account for that in the design. With the family we went through what they need to store where, and chose the materials. We agreed on light oak, white laminate and graphite details.
Week 2: design and visualisation
During the week we prepared a 3D design of the whole flat and sent it to the family. The customers looked at the kitchen, bedroom and children's room from various angles and came back with three requests for changes: a bigger island, two more sockets in the hallway and a different order of shelves in the bookcase. By the end of the week we sent a corrected version and an itemised quote with a fixed price.
Week 3: contract and production preparation
We signed a contract with a fixed price and deadline, the family paid a 50% deposit and we ordered boards and hardware. We prepared production drawings room by room and loaded them onto the CNC workstation. Thanks to digital preparation, waste is minimised during cutting.
Weeks 4 and 5: production
In the workshop boards were cut, edges glued and carcasses assembled. The kitchen was made first, because its installation is the most demanding. After every finished part we sent the family a photo so they knew what stage the order was at. We check quality before packing: we measure angles, test drawers and adjust hardware.
Week 6: installation and handover
In the last week we arrived with a team of fitters. The kitchen took three days, the other rooms two. We worked room by room, so the family could use the rest of the flat in the meantime. After each day we cleaned up and took away the packaging. On the last day we went through all the wardrobes together, adjusted the doors and handed over the protocol and warranty cards.
Budget and payments
We priced the whole flat itemised by room, so the family knew what the kitchen, wardrobes and children's room cost separately. Payment came in two parts: a 50% deposit when the contract was signed and the rest at handover. If the brief had changed, we would have submitted an amendment with a new price and deadline. There was no change to the price, however, because the brief stayed the same.
Risks and how we handled them
- Material delay: we ordered boards and hardware immediately after signing and checked their availability.
- Uneven walls: measuring revealed deviations, which we took into account in the drawings.
- Overlapping trades: we planned installation after painting and floors were finished, so nothing was damaged.
- Changes along the way: small adjustments were handled before production started, not during installation.
The result
The flat was furnished exactly on time and the price matched the quote. The family did not have to deal with any other suppliers and could move in right after handover. Thanks to the built-in wardrobes, no free-standing furniture was used in the flat at all, so the space feels airy.
Communication during the order
The family had one contact person who answered all questions. Every week we sent a short summary: what is done, what is being made now and what comes next week. Thanks to this they did not have to call to find out the status. During installation the family met the same team leader, who knew the design and all the agreed details.
The numbers at a glance
- 6 weeks from signing to handover
- 6 rooms furnished with one order
- 5 days of installation in total
- 5 years of warranty on workmanship and hardware
- CZK 0 extra compared with the quote
What follows from it
- One order means one deadline. You don't have to assemble a schedule from five suppliers.
- A 3D design saves time. Changes are made on the screen, not during installation.
- A fixed price gives peace of mind. You know in advance how much you will pay.
- Photos from production reassure. You don't have to ask when it will be ready.
What we learned
Decisions in the first two weeks save the most time. Whoever knows what they want and can approve the design on time gets the furniture sooner. It also helps when the family names one person who communicates with us. And finally: photos from production are not just marketing, they really do reassure.
Want a similar project?
If you plan to furnish a whole flat or house, write us the basics: the number of rooms, the approximate area and the deadline. Within one working day we will tell you whether we can fit it in and prepare an estimated price. Measuring and the first design are free.
Note: the project described is a model example. We always set actual deadlines and prices after measuring your flat.